Logistic

To improve the production area’s layout, since September 2014 logistics and finishing areas have been moved to a new location. Two kilometers far away from the headquarter based in Silla, two connecting industrial buildings, respectively 1000 and 1200 square meters, have been assignedto the finishing and logistics department. The new warehouse is fully automated and integrated into the company’s IT system.

The finishing department activities are deburring and sandblasting, the latter performed by one conveyor and one tumbling machines, able to manage the needs of the most important esthetical market requirements.

The new 1600 pallet storage spaces for finished products allow our company to manage the best way the most common methods for goods shipment, such as kanban and consignment stock.

Realizzazione e gestione tecnica del sito a cura di
iprov.com Iprov.com
Grafica, design e comunicazione
cosmobile.net Cosmobile.net
Sviluppo e gestione dati